Last Updated: 23 October 2026
At a Glance
ℹ Planned Implementation Dates
- 6 April 2027 – Day-ahead auction MTU resolution changes
- 20 April 2027 – Introduction of N2EX Intraday Auctions (N2EX IDA)
✅ Member Actions
- Existing Day-ahead portfolios: No action required
- New N2EX Intraday Auction portfolios: Required
- GB HHA market: Discontinued and replaced by N2EX IDA1
⚠ Key Reminder
- The Day-ahead MTU resolution changes will be implemented before the N2EX Intraday Auctions go-live.
Contents:
- Overview
- Implementation timeline
- Day-ahead Auction Changes – multi-resolution
- Introduction of N2EX Intraday Auctions (N2EX IDA)
- Member preparation
- Portfolio considerations
- Supported products and order types
- Production and Member Test access
- Auction API
- User Guide
- Member Testing
- Market and Product Codes in CASS
- Support
Overview
This chapter outlines the next implementation phases of the implicit trading solution on the North Sea Link (NSL) interconnector, planned for implementation in April 2027.
Since 2021, Nord Pool has successfully operated the implicit Day-ahead auction between Great Britain and Norway. Trading will continue to be integrated into Nord Pool’s auctions in Great Britain and Norway with the addition of two new Intraday Auctions (N2EX IDA) and a change of Market Time Units (MTU) in the existing N2EX auction. As such, N2EX trading, and the upcoming N2EX Intraday Auctions will remain outside the common European electricity market.
Implementation Timeline
The following changes will be introduced:
Planned Go-Live Date | Change |
6 April 2027 | Day-ahead auction Market Time Unit (MTU) resolution changes in the existing N2EX auction Introducing 30-minute MTU alongside the existing 60-minute products in GB and the introduction of 15-minute MTU and 30-minute products alongside the existing 60-minute products in Norway. |
20 April 2027 | Introduction of N2EX Intraday Auctions (N2EX IDAs). One of which will replace the existing GB Half-Hourly Intraday Auction (GB HHA). |
Note: The Day-ahead resolution changes will be implemented prior to the go-live of the N2EX Intraday Auctions.
Day‑ahead Auction Changes – multi-resolution
The Day-ahead auctions will move to multi-resolution trading:
- Great Britain (N2EX): Introduction of 30-minute MTU in addition to the existing 60-minute products
- Norway (NO2): Introduction of 15-minute MTU and 30-minute products in addition to the existing 60-minute products
- NSL Interconnector: Resolution will change to 30-minute MTU
- Gate Closure Times (GCT): No changes for N2EX or NO2 auctions
Introduction of N2EX Intraday Auctions (N2EX IDA)
N2EX Intraday Auctions will be introduced with NSL capacity:
- NSL Capacity: Offered with 30-minute MTU
- Trading Resolution: Single resolution per market:
- Great Britain (GB): 30-minute MTU
- Norway (NO2): 15-minute MTU
- Gate Closure Times (CET):
Auction | Gate Closure | Delivery |
N2EX IDA1 | 15:30 CET (D-1) | 00:00–24:00 CET |
N2EX IDA2 | 08:30 CET (D) | 12:00–24:00 CET |
Note: The existing GB Half-Hourly Intraday Auction will be replaced with N2EX IDA1
Member Preparation
Participants should prepare for the following:
- Support for new MTU resolutions
- New Auction Product IDs
- New Market and Product codes in CASS
- Creation of new portfolios in the N2EX Intraday Auction
- Discontinuation of the GB Half-Hourly Intraday Auction (GB HHA) market
- Members with existing access to the GB Half-Hourly Intraday Auction (GB HHA) market will be given access to the N2EX IDA1 Intraday Auction (through new portfolios)
Portfolio Considerations
- Portfolios in the Auction platform support all MTU resolutions and can be used across auctions. No action is required for existing Day-ahead portfolios. However:
- Curve orders can only be submitted with one resolution per bidding zone per auction per portfolio.
- If multiple curve orders with different resolutions are required within the same bidding zone and auction, additional portfolios must be requested.
- Block orders can only be submitted with one resolution per bidding zone per auction per portfolio.
- Exclusive group orders can only be submitted with one resolution per bidding zone per auction per portfolio.
- For N2EX Intraday Auctions, new portfolios are required, as this is a new market.
- GB HHA portfolios will be discontinued (no action needed from users)
Supported Products and Order Types
Products available in Production and Member Test environments are aligned.
Auction | IDA | Order Types | Market / Bidding Zone |
15 min 30 min 60 min |
15 min
| Curve, Block, Profile Block, Exclusive Groups, Linked Block, Spread Block | Norway / NO2 |
30 min 60 min |
30 min
| Curve, Block, Profile Block, Exclusive Groups, Linked Block, Spread Block | Great Britain / GB |
30 min | 30 min | Not applicable | - |
The platform supports the following order types: curve orders, block orders (including profile, linked and spread blocks), and exclusive group orders. These can be submitted directly through the web platform, uploaded via Excel sheets or via the Auction API.
- Curve orders (hourly orders): One curve order is permitted in each area per portfolio. Further details are provided in the relevant documentation here.
- Block orders: Supported types include regular block orders, profile blocks, linked blocks and spread blocks. These are described in the relevant documentation here.
- Exclusive group orders: Described in the relevant documentation here.
NOTE: Always refer to the Product Specifications on the Nord Pool website under Rules and Regulations for most up-to-date information on order types, portfolio restrictions and order limits per market.
The updated Product Specification specific to the N2EX market will be published when available and announced separately.
Production and Member Test Access
- System Links available here - Access to the Production and Member Test environments.
Accessing the Auction Platform
To begin using the auction, please follow these steps:
- Ensure your user account is enabled for the auction (contact Support if you need access).
- Access the platform via the system links in this section.
- Log in using your existing Auction platform credentials. (refer here for login help).
- Submit orders as required. Additional details are available in the User Guide in the section below.
Auction API
Nord Pool provides a REST JSON API for accessing the Auction platform:
- Available for the N2EX Day-ahead Auction
- The Auction API will fully support the new MTU resolutions and the introduction of the N2EX Intraday Auctions.
- Documentation can be found in our API Developer Portal here.
The updates specific to the N2EX market in the API documentation can be found in our API Portal here: Auction API - Submit and modify orders
User Guide
- The full user guide is here: Auction User Guide
Member Testing
Member Testing has already begun in Nord Pool’s Member Test Environment (MT) since August 2026 using the “TEST_” auctions below which are automatically executed daily:
- Test_N2EX_DA_3 – added in Auction Platform in MT on 11 August 2026
- Test_N2EX_IDA_1 – added in Auction Platform in MT on 27 August 2026
- Test_N2EX_IDA_2 – added in Auction Platform in MT on 28 August 2026
Nord Pool will announce when the remaining auction will be introduced in the Test Environment. These auctions listed below are manually executed only in exceptional cases. For example, when coordinated Member Testing is conducted to simulate specific operational scenarios*.
- N2EX_DA_3 - added in Auction Platform in MT on 30 June 2026
- N2EX_IDA_1 – will be announced separately when available in MT
- N2EX_IDA_2 – will be announced separately when available in MT
* Nord Pool will announce when coordinated Member Testing will be arranged for Market Participants.
The following auctions are available in the Member Test environment.
Description | Product ID | Gate Closure Time (GCT) | Description |
Test N2EX Day Ahead 30 | TEST_N2EX_DA_3 | 11:10 CET | Automatically executed daily. Intended for customer testing activity. |
Test N2EX Intraday Auction 1 | TEST_N2EX_IDA_1 | 15:40 CET | Automatically executed daily. Intended for customer testing activity. |
Test N2EX Intraday Auction 2 | TEST_N2EX_IDA_2 | 08:40 CET | Automatically executed daily. Intended for customer testing activity. |
N2EX Day Ahead 30 | N2EX_DA_3 | 10:50 CET | Manually executed only in exceptional cases and specific operational scenarios. |
N2EX Intraday Auction 1 | N2EX_IDA_1 | 15:20 CET | Manually executed only in exceptional cases and specific operational scenarios. |
N2EX Intraday Auction 2 | N2EX_IDA_2 | 08:20 CET | Manually executed only in exceptional cases and specific operational scenarios. |
Market and Product Codes in CASS
In Nord Pool’s Clearing and Settlement System (CASS) there are Market and Product codes that are mapped to each auction. For the existing N2EX auction then these codes will remain unchanged. For the new N2EX IDAs, then new Market and Product code will be introduced.
The Table below shows the mapping of Auction to CASS Market and Product Codes in Production:
Product ID in Auction | Description | Market Code in CASS | Product Codes in CASS |
N2EX_DA_3 | N2EX Day Ahead 30 | N2EXDA | In NO2: N2EX_DA_3-20260417-01_QH N2EX_DA_3-20260417-01_HH N2EX_DA_3-20260417-01_H In UK: N2EX_DA_3-20260417-01_HH N2EX_DA_3-20260417-01_H |
N2EX_IDA_1 | N2EX Intraday Auction 1 | N2EXIDA | In NO2: N2EX_IDA_1-20260417-01_QH In UK: N2EX_IDA_1-20260417-01_HH |
N2EX_IDA_2 | N2EX Intraday Auction 2 | N2EXIDA | In NO2: N2EX_IDA_2-20260417-01_QH In UK: N2EX_IDA_2-20260417-01_HH |
Note: In the test environment, then the Product ID, Market Code and Product Codes in the table above will be prefixed with “TEST_”
Note: The existing GB Half-Hourly Auction code (GB_HH_1) and the CASS Market code (NPGBHHA) will be discontinued and will only be available for retrieval of historical data.
Support
If you have any questions, please contact your Nord Pool market manager or support@nordpoolgroup.com